Skip to content
LandmAIn

Solar

See the land behind the solar opportunity.

Screen solar on its own requirements. Combine resource and terrain context with usable acreage, land-use evidence, and the generation interconnection questions that shape a project.

Inside the LandMain platform

Compare terrain across solar site candidates.

Review mean slope, elevation range, and connected low-slope areas to compare land characteristics and guide solar layout decisions.

See the platform with your team ↗
LandMain terrain analysis showing mean slope, elevation range, connected low-slope area, and a color-coded slope map
Weld County example · 1.51% mean slope · 10.4 m elevation range.Platform view · October 20, 2026

A use-specific screen

Where do resource, land, and connection requirements align?

Set project requirements and compare the land, infrastructure, and policy findings that shape your development options.

  • Solar resource and terrainReview sunlight estimates, source periods, slope, and data coverage. Separate regional resource estimates from site-specific production modeling.
  • Usable layout areaInvestigate contiguous developable acres after access, setbacks, environmental conditions, and other exclusions.
  • Generation interconnectionIdentify the relevant utility process and evidence needed to understand export capacity, upgrades, costs, and timing.
  • Land control and local requirementsReview ownership research, potential control structure, local solar permissions, and nearby land uses.
LandMain terrain analysis of an Adams County site showing 1.87 percent mean slope, elevation range, and a color-coded slope map
Adams County example · 1.87% mean slope · 21.2 m elevation range.Platform view · October 20, 2026

What you can take forward.

01 / DELIVERABLE

Solar screening brief

A transparent record of resource, terrain, land, and connection assumptions.

02 / DELIVERABLE

Candidate comparison

Compare sites using solar-specific requirements and visible evidence gaps.

03 / DELIVERABLE

Solar plus storage review

Add a separate battery assessment for charging, export, footprint, and permitting.