Skip to content
LandmAIn

Battery storage

Find a place for the next energy connection.

Battery energy storage systems need a distinct site assessment. Investigate standalone storage or a paired project with separate evidence for charging, export, layout, and local requirements.

Inside the LandMain platform

Investigate land around your target connection.

Draw a project footprint, explore intersecting sites, and review mapped infrastructure and land characteristics in the site investigation panel.

See the platform with your team ↗
LandMain platform showing a drawn project footprint, satellite map, intersecting sites, and a site investigation panel
A project footprint connects the search area to individual site details.Platform view · October 20, 2026

A use-specific screen

What must be established for this storage project?

Set project requirements and compare the land, infrastructure, and policy findings that shape your development options.

  • Charging and exportTrack the evidence for both directions of power flow, the proposed configuration, and the relevant utility review.
  • Usable footprintInvestigate equipment area, setbacks, internal circulation, expansion, and space for supporting infrastructure.
  • Local approvals and emergency accessIdentify storage-specific land-use requirements and questions for fire and emergency-response reviewers.
  • Surrounding uses and site controlReview neighboring uses, residential separation, access, environmental context, and potential land-control terms.

What you can take forward.

01 / DELIVERABLE

Storage site brief

A use-specific record of site conditions, known requirements, and unresolved evidence.

02 / DELIVERABLE

Connection questions

A coordinated list of charging and export questions for the relevant provider.

03 / DELIVERABLE

Alternative-use comparison

Compare storage with solar, data center, or industrial development on the same land.